Every effort will be made to maintain access to residences, businesses and sidewalks while work takes place. However, during construction hours, vehicle access to and from homes and businesses may be impacted and alternative parking arrangements should be made. The contractor will ensure that all driveways are accessible at the end of the work day. 

Road From To Distance Dates Scope of Work
Big Island Road 1011 Big Island Road 1042 Big Island Road 0.35 km July - August 2024 Pulverization, Granular 'A' and Stabilization
Bird Lane* Taylor Road (Muskoka Road 42) End 0.35 km May - December 2024 Reconstruction

Colony Road

Fraserburg Road (Muskoka Road 14)

End of year-round maintained road

1.85 km

July - August 2024

Slurry Seal

Covered Bridge Trail

Ball's Drive / West Mall Road intersection

westerly

TBD

July - September 2024

Partial Depth Removal and Hot-Mix Paving

Davis Court

Meadow Heights Drive

End

0.2 km

June - August 2024

Micro-Surfacing

Germania Road

Doe Lake Road (Muskoka Road 20)

Devaladares Road

1.1 km

July - August 2024

Slurry Seal 

Glendale Road

Daleman Drive

southerly 

0.3 km

July - August 2024

Hot-Mix Paving

Gow Street

Woodward Street

End

0.1 km

June - August 2024

Micro-Surfacing

Hiram Street*

Ann Street

McDonald Street

0.28 km

TBD

Reconstruction 

Kirby's Beach Road

Beaumont Drive (Muskoka Road 16)

End

0.20 km

June - August 2024

Micro-Surfacing

Lone Pine Drive

Stephenson Road No. 1 West

southerly

2.5 km

June - August 2024

Pulverization, Granular 'A', Base Stabilization, Surface Treatment

Matthiasville Road

Hwy 118 (east)

2.4 km east of Black Bridge

2.4 km

July - August 2024

Slurry Seal

Peterson Road

Uffington Road (Muskoka Road 20)

westerly

1.9 km 

June - August 2024

Pulverization, Granular 'A', Base Stabilization, Surface Treatment 

Pinewood Drive

Sherwood Drive

Sander Drive

0.3 km

July - August 2024

Hot-Mix Paving

Richard Street*

Woodchester Avenue (0.1 km east)

Bird Lane

0.26 km

2024

Reconstruction

Stoneleigh Road

Muskoka Road 117

Peace Valley Road South

3.6 km 

July - August 2024

Slurry Seal

Vankoughnet Road

Hwy 118 (easterly entrance)

Cherish Lane PVT

1.7 km

June - August 2024

Pulverization, Granular 'A', Base Stabilization, Surface Treatment 

Vankoughnet Road

Hwy 118 (westerly entrance)

Cherish Lane PVT

1.85 km

July - August 2024

Slurry Seal 


While road work takes place, traffic will be maintained to a minimum of one (1) lane. Please follow all on-site signage and allow extra travel time for delays. Residents can also expect some noise, dust and vibration during construction.

Garbage schedules will be maintained during this time. For details visit muskoka.on.ca.

For more information, visit bracebridge.ca.



- 30 -




About Bracebridge – The Town of Bracebridge is located in the Heart of Muskoka, the epitome of Canada’s Cottage Country. With a population in excess of 17,000 permanent residents that doubles during the summer months, the community has a diversified economy that is highlighted by strong construction, hospitality and professional sectors. Bracebridge is the steward of the cottage country brand and is teaching the world the power of living the Muskoka lifestyle in its spirit, the arts, food, home and recreation. The Town is positioned on the 45th parallel, halfway between the Equator and the North Pole, and is recognized as Santa’s summer home.




MEDIA CONTACT

Town of Bracebridge
media@bracebridge.ca

This website uses cookies to enhance usability and provide you with a more personal experience. By using this website, you agree to our use of cookies as explained in our Privacy Policy.