Removal of Concrete Sidewalk Trip Hazards

The removal of approximately 115 concrete sidewalk trip hazard locations throughout the urban core of the municipality by cutting the concrete on an angle. Cutting and removal of the barrier portion of the curb and gutter at 14 Ontario Street for a minimum length of 3.0 metres.

RFQ Issue Date: Thursday, April 24, 2025

RFQ Closing Date and Location: Thursday, May 8, 2025 at 2:00 p.m., local time at the Public Works Department, Town of Bracebridge Municipal Office at 1000 Taylor Court, Bracebridge, ON

  • RFQs will be opened virtually via a Zoom meeting at 2:30 p.m. on the RFQ Closing Date.
  • All Proponents and the public have the option of accessing the virtual meeting as a viewer only. If you are interested in attending the virtual meeting, please contact publicworks@bracebridge.ca

Designated Town Contact: Aidan Fitchett, Engineering Technologist; afitchett@bracebridge.ca