Public Works Projects
The Public Works Department oversees a wide range of projects every year which are approved by Council to meet the goals of the Town's strategic plan. This process of scheduled maintenance and planned reconstruction keeps infrastructure functioning and in a sustainable condition. A list of current initiatives is noted below:
- High Falls Bridge Replacement
- OSIM Bridge Inspection
- Bird Mill Mews Exterior Grounds and Accessible Entrance Door Installation
- Chapel Gallery Septic Alarm Repairs and Shingle Replacement
- Electric Vehicle Feasibility and Infrastructure
- Municipal Office Roof Rehabilitation (Roof 1)
- Municipal Office Signage
- Oakley Village Square Community Centre Sports Field Improvements
- Annie Williams Memorial Park Labyrinth
- Dock/Structure Condition Assessments
- George Road Landing Rehabilitation
- Gostick Park Field House Repairs
- Kelvin Grove Park Rowing Dock Replacement
- Memorial Park Bandshell Replacement
- Park Signage Improvements (JD Lang Park and Muskoka Falls Beach Park)
- Peake Fields at Verena Acres - Shade Strcuture for Playground
- Taylor Road Roundabout Garden Redevelopment
Road |
From |
To |
Distance |
Dates |
Scope of Work |
---|---|---|---|---|---|
Big Island Road |
1011 Big Island Road |
1042 Big Island Road |
0.35 km |
July-August 2024 |
Pulverization, Granular 'A' and Stabilization |
Bird Lane* |
Taylor Road (Muskoka Road 42) |
End |
0.35 km |
May - December 2024 |
Reconstruction |
Colony Road |
Fraserburg Road (Muskoka Road 14) |
End of year-round maintained road |
1.85 km |
July - August 2024 |
Slurry Seal |
Covered Bridge Trail |
Ball's Drive / West Mall Road intersection |
westerly |
TBD |
July - September 2024 |
Partial Depth Removal and Hot-Mix Paving |
Davis Court |
Meadow Heights Drive |
End |
0.2 km |
June - August 2024 |
Micro-Surfacing |
Germania Road |
Doe Lake Road (Muskoka Road 20) |
Devaladares Road |
1.1 km |
July - August 2024 |
Slurry Seal |
Glendale Road |
Daleman Drive |
southerly |
0.3 km |
July -August 2024 |
Hot Mix Paving |
Gow Street |
Woodward Street |
End |
0.1 km |
June -August 2024 |
Micro-Surfacing |
Hiram Street* |
Ann Street |
McDonald Street |
0.28 km |
TBD |
Reconstruction |
Kirby's Beach Road |
Beaumont Drive (Muskoka Road 16) |
End |
0.20 km |
June - August 2024 |
Micro-Surfacing |
Lone Pine Drive |
Stephenson Road No. 1 West |
southerly |
2.5 km |
July - August 2024 |
Pulverization, Granular 'A', Base Stabilization, Surface Treatment |
Matthiasville Road |
Hwy 118 (east) |
2.4 km east of Black Bridge |
2.4 km |
July - August 2024 |
Slurry Seal |
Peterson Road |
Uffinton Road (Muskoka Road 20) |
westerly |
1.9 km |
June - August 2024 |
Pulverization, Granular 'A', Base Stabilization, Surface Treatment |
Pinewood Drive |
Sherwood Drive |
Sander Drive |
0.3 km |
July - August 2024 |
Hot-Mix Paving |
Richard Street* |
Woodchester Avenue (0.1 km east) |
Bird Lane |
0.26 km |
2024 |
Reconstruction |
Spencer Street* |
Andrea Drive |
Santa's Village Road (Muskoka Road 15) |
0.65 km |
2024 |
Pulverization, Asphalt |
Stoneleigh Road |
Muskoka Road 117 |
Peace Valley Road South |
3.6 km |
July - August 2024 |
Slurry Seal |
Vankoughnet Road |
Hwy 118 (easterly entrance) |
Cherish Lane Private |
1.7 km |
June - August 2024 |
Pulverization, Granular 'A', Base Stabilization, Surface Treatment |
Vankoughnet Road |
Hwy 118 (westerly entrance) |
Cherish Lane Private |
1.85 km |
July - August 2024 |
Slurry Seal |
*To be completed in coordination with the District Municipality of Muskoka.
- Bird Lane
- Glendale Road
- Hiram Street*
- James Street
- Manitoba Street
- Meadow Heights Drive
- Quebec Street
- Rene Caisse Lane
- Richard Street
- Sidewalk Deflection Repairs
*To be completed in coordination with the District Municipality of Muskoka.
- Bird Lane Storm Sewer Construction
- Cedar Lane Concrete Structure Design
- Kimberley Avenue (south) Storm System Rehabilitation
- Mahaffy Court Storm Fall Outfall Design
- Meadow Heights Drive Storm Sewer Outfall Reconstruction
- Richard Street Storm Sewer Construction
- Replacement of Streetlights to LED in the Rural Areas
- Environmental Project Scoping
- Municipal Storm Water System Review
- Roadside Safety Guiderail Study
- Rural Culvert Inventory
- Pedestrian Crossover at the Intersection of Clearbrook Trail and Rosemead Close
- Sidewalk Assessment Program
- Sign Inventory Study
- Site Alteration By-Law Update
- Speed Limit Review
- Transportation Master Plan Implementation
- Urban Forest Management Study
- Winter Operations Level of Service Review
- Transit Master Plan Outcomes: Software Upgrades